ISUZU OEM Standard Push Rod for 4JH1 4JB1 4JA1 4JG1 Engines — Lightweight 0.06kg Valve Train Component
| Net Weight: | 0.06 Kg | Material: | Metal |
| Installation Position: | Between Tappet And Rocker Arm | Compatible Engines: | ISUZU 4JH1, 4JB1, 4JA1, 4JC1, 4JG1, 4JG2 |
| Compatible Models: | ISUZU NKR77, NKR55, NKR66, NKR69, NKR71, NHR, NPR, NQR, NLR, NMR, QKR, TFR, TFS | Parts Figure-Key Number: | 014-088 |
| OEM Part Number: | 8-97071673-0 / 8970716730 | Associated Numbers: | 8-94143202-0 / 8941432020、8-97071673-1 / 8970716731 |
| High Light: | OEM Standard Push Rod,Compatible with ISUZU 4JH1 Valve Train Component,Lightweight 0.06kg ROD; PUSH |
||
The ISUZU Push Rod with OEM numbers 8-97071673-0 / 8970716730 is a precision-engineered replacement designed for ISUZU NKR77 series light-duty trucks, compatible with 4JH1, 4JB1, 4JA1, and 4JG1 diesel engines. This component is a core part of the engine's valve train — the Push Rod (ROD; PUSH) — responsible for transferring camshaft lift motion to the rocker arms for precise valve actuation.
The push rod is a critical force transmission component of the engine's valve train, installed between the tappet and the rocker arm. Its working principle includes:
- Force Transmission: As the camshaft rotates, the cam lobe pushes the tappet upward, transferring force to the lower end of the push rod.
- Lift Transfer: The push rod transmits the tappet's lift motion upward to the rocker arm, causing it to pivot.
- Valve Actuation: The rocker arm's pivot motion pushes the valve stem downward, overcoming spring pressure to open the intake or exhaust valve.
- Return: After the cam lobe passes its peak, the valve spring closes the valve, and the push rod returns to its original position.
| Symptom | Probable Cause |
|---|---|
| "Tapping" metallic noise from engine (valve train noise) | Bent or worn push rod; excessive valve clearance |
| Reduced engine power; poor acceleration | Deformed push rod reducing valve lift |
| Rough idle; engine vibration | Damaged push rod affecting individual cylinder valve operation |
| Visual inspection shows bent, worn, or broken push rod | Material fatigue from long-term high-load operation or poor lubrication |
| Hard starting | Severely damaged push rod preventing proper valve opening |
| Brand | Model Series | Compatible Engine | Notes |
|---|---|---|---|
| ISUZU | NKR77 | 4JH1, 4JB1 | Light-duty truck |
| ISUZU | NHR | 4JA1, 4JB1 | Light-duty truck |
| ISUZU | NPR | 4JB1 | Light/medium-duty truck |
| ISUZU | NQR | 4JG1, 4JG2 | Medium-duty truck |
| ISUZU | TFR / TFS | 4JA1, 4JB1 | Pickup truck |
- Number Confirmation: This product number is 8-97071673-0 / 8970716730. Associated numbers include 8-94143202-0 / 8941432020 and 8-97071673-1 / 8970716731. Verify the specific number on the original part before ordering.
- Installation Orientation: Push rods have a specific up/down orientation — ensure the upper end faces the rocker arm and the lower end faces the tappet.
- Valve Clearance Adjustment: After push rod replacement, valve clearance must be adjusted to ISUZU workshop manual specifications.
- Associated Components: When replacing push rods, it is recommended to inspect tappets, rocker arms, and valve clearance adjusting screws — replace if necessary.
- Lubrication: Apply engine oil to both ball ends of the push rod before installation.
- Set Replacement Recommended: If one push rod is damaged, inspect all push rods and replace as a set if necessary.
- Professional Installation: Push rods are critical valve train components requiring precision valve clearance adjustment — must be performed by a qualified engine repair technician.
Manufactured to ISUZU original specifications — ensures perfect fitment for NKR77/4JH1/4JB1/4JA1/4JG1 engines; direct OEM replacement, no modification required.
Weight of only 0.06kg — reduces reciprocating mass and inertia loads; improves engine response performance.
Every piece undergoes strict quality inspection — 100% tested before delivery.
Reliable after-sales protection — 1-year quality guarantee.
Fits NKR77, NKR, NPR, NHR, NLR, NMR, QKR, TFR, TFS models and 4JH1, 4JB1, 4JA1, 4JC1, 4JG1, 4JG2 engines.
MOQ 5 pieces, delivery 5–8 working days — meets diverse procurement needs.
| QC Item | Inspection Method | Acceptance Criterion | Frequency |
|---|---|---|---|
| Push rod length | Height gauge / CMM | OEM standard size ± tolerance | 100% |
| Push rod diameter | Micrometer | OEM standard size ± tolerance | 100% |
| Ball end surface hardness | Rockwell hardness tester (HRC) | Standard hardness range | Batch sampling |
| Push rod straightness | V-block + Dial indicator | ≤ standard value | Batch sampling |
| Material composition | Spectrometer | Per metal standard | Batch sampling |
| Visual inspection | Visual | No scratches, burrs, or rust | 100% |
| 100% function test | Special inspection equipment | 100% tested | 100% |
Push rods are critical valve train components — improper installation may cause valve failure and severe engine damage. Replacement requires precision valve clearance adjustment — must be performed by a qualified engine repair technician.
Preparation:
- Confirm engine model (4JH1 / 4JB1 / 4JA1 / 4JG1) and part number (8-97071673-0)
- Prepare tools: Socket wrench, feeler gauge, torque wrench, engine oil
- Recommended to also prepare: Valve cover gasket, tappets (if needed)
Removing Old Push Rod:
- Park vehicle on level surface, engage parking brake, and allow the engine to cool.
- Remove the valve cover.
- Remove the rocker arm assembly, note the position of each push rod.
- Remove the old push rods and inspect for bending, wear, or cracks.
- Inspect tappets and rocker arms for wear.
Installing New Push Rod:
- Inspect new push rod: Check for scratches, burrs, or defects.
- Lubricate: Apply engine oil to both ball ends of the new push rod.
- Install push rod: Install the new push rod in its original position between the tappet and rocker arm — note the orientation.
- Install rocker arm assembly: Install the rocker arm assembly and torque bolts to specification.
- Adjust valve clearance: Valve clearance must be adjusted to ISUZU workshop manual specifications.
- Install valve cover: Install the valve cover with a new gasket.
| Item | Interval | Notes |
|---|---|---|
| Valve clearance check/adjustment | Every 20,000~30,000 km | Check immediately if noise detected |
| Push rod inspection | During engine overhaul | Check for bending or wear |
| Push rod replacement | Upon bending/wear | Replace as a set if necessary |
| Packaging | Neutral Carton |
| Quantity per package | 5 pieces/pack |
| Product Net Weight | 0.06 kg |
| Brand | OEM Standard |
| Place of Origin | China |
| Customization Options | OEM custom packaging / neutral packaging / private labeling |
| Minimum Order Quantity | 5 pieces |
| Delivery Time | 5–8 working days |
| Warranty | 1 year |
| HS Code | 840999100 |
| Target Customers | Truck parts wholesalers, light-duty truck repair shops, engine overhaul shops, fleet purchasers, export traders |