| MOQ: | 5 pcs |
| Price: | Negotiable |
| Standard Packaging: | Neutral Package or as customers’ request |
| Delivery Period: | 5-8 Work Days |
| Payment Method: | T/T,Western Union |
| Supply Capacity: | 10000 pcs/month |
| Vehicle / Engine | Details |
|---|---|
| ISUZU 700P | Medium‑duty chassis, 4x2 configuration, GVW 5.5-7.5 tons |
| ISUZU N‑Series | NPR, NQR (2011‑2017) with 4HK1 5.2L engine |
| ISUZU FRR / FVR | 4HK1 engine applications |
| ISUZU 4HK1 | 5.2L inline‑4 turbo diesel, common rail (189 hp @ 2,800 rpm, 588 Nm torque) |
| Construction Machinery | Hitachi, Case, JCB excavators with 4HK1 / 6HK1 engines |
| Feature | Benefit + Verification Signal |
|---|---|
| Complete assembly | Simplified replacement — all components in one box. No need to source individual parts |
| Transparent water bowl | Visual water level inspection — water level can be checked without disassembly |
| Heated version compatibility | Cold‑weather reliability — heated sedimenter kit prevents fuel gelling |
| Protects common rail injection system | Prevents costly injector failure — removes up to 99% of free water and large particles |
| IATF 16949 / ISO 9001:2015 certified | Consistent OE‑level quality — produced under automotive industry's strictest quality standards |
| Component | Interval (Miles) | Interval (Km) | Time |
|---|---|---|---|
| Main Fuel Filter | 15,000 | 24,000 | Or every 12 months |
| Secondary Fuel Filter | 15,000 | 24,000 | Or every 12 months |
| Drain water from sedimenter | Monthly / as needed | Monthly / as needed | When water appears |
| MOQ: | 5 pcs |
| Price: | Negotiable |
| Standard Packaging: | Neutral Package or as customers’ request |
| Delivery Period: | 5-8 Work Days |
| Payment Method: | T/T,Western Union |
| Supply Capacity: | 10000 pcs/month |
| Vehicle / Engine | Details |
|---|---|
| ISUZU 700P | Medium‑duty chassis, 4x2 configuration, GVW 5.5-7.5 tons |
| ISUZU N‑Series | NPR, NQR (2011‑2017) with 4HK1 5.2L engine |
| ISUZU FRR / FVR | 4HK1 engine applications |
| ISUZU 4HK1 | 5.2L inline‑4 turbo diesel, common rail (189 hp @ 2,800 rpm, 588 Nm torque) |
| Construction Machinery | Hitachi, Case, JCB excavators with 4HK1 / 6HK1 engines |
| Feature | Benefit + Verification Signal |
|---|---|
| Complete assembly | Simplified replacement — all components in one box. No need to source individual parts |
| Transparent water bowl | Visual water level inspection — water level can be checked without disassembly |
| Heated version compatibility | Cold‑weather reliability — heated sedimenter kit prevents fuel gelling |
| Protects common rail injection system | Prevents costly injector failure — removes up to 99% of free water and large particles |
| IATF 16949 / ISO 9001:2015 certified | Consistent OE‑level quality — produced under automotive industry's strictest quality standards |
| Component | Interval (Miles) | Interval (Km) | Time |
|---|---|---|---|
| Main Fuel Filter | 15,000 | 24,000 | Or every 12 months |
| Secondary Fuel Filter | 15,000 | 24,000 | Or every 12 months |
| Drain water from sedimenter | Monthly / as needed | Monthly / as needed | When water appears |